A design of the bridge construction down the regional road No. 936 Wodzisław Śląski - Krzyżanowice on the Odra River in Krzyżanowice. A pre-stressed three-span concrete facility with a box girder made with the use of the pre-stressed concrete method.
Basic technical parameters of the facility:
GPS coordinates: 49.993444, 18.287820
A project of repairing bridge constructions down the national road No. 1 at 27 + 874 km, above Chrzanowska Street and the railway track. Five-span facilities with a prefabricated concrete structure - beams of Płońsk type.
Basic technical parameters of the facility:
GPS coordinates: 50.202401, 19.167403
A project of repairing a bridge construction down the national road No. 1 at 42+863 km over the national road No. 86 in Tychy. The bridge construction is a five-span expanded facility made from prefabricated beams of Płońsk type that, together with the pillars and supporting slab zones, creates a hingeless rigid frame construction.
Basic technical parameters of the facility:
GPS coordinates: 50.133880, 19.02542
A design of the bridge construction down the regional road No. 933 Rzuchów-Chrzanów on the Vistula River in Góra. A reinforced concrete, four-span, beam and slab facility.
Basic technical parameters of the facility:
GPS coordinates: 49.973125, 19.110195
A project of modernization of bridge constructions down the national road No. 1 above Rakowska Street in Częstochowa. Three-span facilities with a prefabricated concrete structure - beams of Płońsk type. Spans expanded with a connecting reinforced concrete slab.
Basic technical parameters of the facility:
GPS coordinates: 50.772774, 19.156489
A project of construction of a bridge construction n/t PKP i PMP PW of the Polish National Railways and the Przedsiębiorstwo Materiałów Podsadzkowych Przemysłu Węglowego (PMP PW) down the national road No. 78 at 63+575 km in Czekanów. A bridge construction with a monolithic reinforced concrete structure, in the form of a three-span expanded structure with a slab construction, based on reinforced concrete disc supports.
Basic technical parameters of the facility:
GPS coordinates: 50.350877, 18.741971
A project of repairing bridge constructions down the national road No. 1 at 25+195 km, above Upadowa Street. Five-span facilities with a prefabricated concrete structure - beams of Płońsk type.
Basic technical parameters of the facility:
GPS coordinates: 50.224968, 19.169646
A project of construction of a platform for pedestrians down the national road No. 1 at 581+596 km in Pszczyna. The suspended platform with reinforced concrete structure. A reinforced concrete pylon.
Basic technical parameters of the facility:
GPS coordinates: 49.967607, 18.958148